• Platforms

    Peregrino A, B and C

  • Distance from the Coast

    85 km

  • Production Unit

    FPSO Peregrino

  •  water depth

    120m

  • People on Board

    470

  • Reserves (2024)

    338 MI BBL

  • Platform Types

    Fixed with attached drilling rig + floating

  • *Based on Reservation Certification (2024)

About Peregrino

  • In 2011 had its first oil
  • It has 27 producer wells and 6 injector wells currently operating
  • Production is carried out through the FPSO Peregrino, with an oil processing capacity of 110 kbbl/d and 300 kbbl/d of water
  • It currently produces an average of 100,000 barrels a day
  • In 2024, we acquired 40% of the Peregrino Field, bringing around 40,000 barrels of oil to our daily production
CURIOSITIES